|
|
|
|
|
|
|
|
|
Expand/Collapse All
|
-
| 1 |
MAIN.AREA |
CLASS 7 |
2002 |
3,755 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
SLT.CPR |
| Baths |
2BA,2HBA,JET,BIDET |
Heat/AC |
HP |
Fireplaces |
ST.BK |
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
SHNGL |
|
|
| 2 |
2ND FLOOR |
CLASS 7 |
2002 |
1,229 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
HP |
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
SHNGL |
|
|
| 3 |
ATTIC, LOW COST |
CLASS 7 |
2002 |
291 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
GARAGE ATTACHED |
CLASS 6 |
2002 |
1,144 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
SLT.CPR,HIP |
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
CC |
Foundation |
CC |
Int Finish |
FIN |
| Ext Finish |
SHNGL |
|
|
-
| 1 |
GARAGE DETACHED |
CLASS 6 |
2002 |
1,008 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
SLT.CPR,GAB |
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
CC |
Foundation |
CC |
Int Finish |
FIN |
| Ext Finish |
STUC |
|
|
| 2 |
ATTIC, PER CLASS |
CLASS 6 |
2002 |
432 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
1BA |
Heat/AC |
HP |
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 3 |
ROOF COVER BAR TILE |
-
|
2003 |
204 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 4 |
CONCRETE FLAT WORK |
-
|
2003 |
204 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 5 |
CONCRETE FLAT WORK |
-
|
2003 |
208 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
GENERAL PURPOSE SHED |
CLASS 6 |
2002 |
240 |
Details |
| Eff Yr Built |
2002 |
Adjustment % |
-
|
Roof Styles |
FCS |
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
FCC |
Foundation |
FCC |
Int Finish |
-
|
| Ext Finish |
BR.ST |
|
|
-
| 1 |
ENCLOSED PORCH |
CLASS 6 |
2003 |
400 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
SLT.CPR |
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
CC |
Foundation |
CC |
Int Finish |
-
|
| Ext Finish |
GLASS |
|
|
-
| 1 |
ROOF COVER BAR TILE |
-
|
2003 |
396 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 2 |
CONCRETE FLAT WORK |
-
|
2003 |
396 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
CC |
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
ROOF COVER BAR TILE |
-
|
2003 |
512 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 2 |
CONCRETE FLAT WORK |
-
|
2003 |
512 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
CONCRETE FLAT WORK |
-
|
2003 |
1,512 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
CC |
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
GENERAL PURPOSE SHED |
CLASS 6 |
2003 |
30 |
Details |
| Eff Yr Built |
2003 |
Adjustment % |
-
|
Roof Styles |
SLT.CPR |
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
CC |
Foundation |
CC |
Int Finish |
-
|
| Ext Finish |
SHNGL |
|
|
| 2 |
GENERAL PURPOSE SHED |
CLASS 6 |
2005 |
72 |
Details |
| Eff Yr Built |
2005 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
FCC |
Foundation |
CC |
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 3 |
GENERAL PURPOSE SHED |
CLASS 6 |
2005 |
72 |
Details |
| Eff Yr Built |
2005 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
FCC |
Foundation |
CC |
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
BRICK PATIO, POURED CC BASE |
-
|
2005 |
1,800 |
Details |
| Eff Yr Built |
2005 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 2 |
WALL, STONE, OVER 4' |
-
|
2005 |
80 |
Details |
| Eff Yr Built |
2005 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 3 |
WALL, STONE, 4' OR LESS |
-
|
2004 |
300 |
Details |
| Eff Yr Built |
2004 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 4 |
GATE, MOTORIZED IRON |
-
|
2005 |
1 |
Details |
| Eff Yr Built |
2005 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
ASPHALT |
-
|
2005 |
1,200 |
Details |
| Eff Yr Built |
2005 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
| 1 |
GARAGE DETACHED |
CLASS 5 |
2008 |
400 |
Details |
| Eff Yr Built |
2008 |
Adjustment % |
-
|
Roof Styles |
CSARCH,GAB |
| Baths |
-
|
Heat/AC |
HP |
Fireplaces |
-
|
| Flooring |
CC |
Foundation |
CCB |
Int Finish |
FIN |
| Ext Finish |
BEV |
|
|
| 2 |
ROOF COVER COMP SHINGLE |
-
|
2008 |
24 |
Details |
| Eff Yr Built |
2008 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
| 3 |
CONCRETE STAMPED |
-
|
2008 |
24 |
Details |
| Eff Yr Built |
2008 |
Adjustment % |
-
|
Roof Styles |
-
|
| Baths |
-
|
Heat/AC |
-
|
Fireplaces |
-
|
| Flooring |
-
|
Foundation |
-
|
Int Finish |
-
|
| Ext Finish |
-
|
|
|
-
|
|
|
| L1 |
406 Tract; Residential; Riverfront |
1.00 Acres |
| L2 |
406 Tract; Residential; Riverfront |
16.74 Acres |
| L3 |
OSD On-Site Development |
- |
| L4 |
LS Landscaping |
- |
| TOTALS |
|
772754.40 Sq. ft / 17.74 acres |
|
|
|
| 2026 (In Process) |
$2,289,490 |
$527,580 |
$2,817,070 |
$0 |
$2,485,910 |
| 2025 |
$2,302,900 |
$580,430 |
$2,883,330 |
$0 |
$2,413,510 |
|
|
|
| |
ROBERTS, CHRISTINE A
|
AMEN LIVING TRUST, CHRISTINE A |
02-009902 |
- |
Special Warranty Deed |
| 11/14/2000 |
KONOW, EMMET A & JANICE M
|
ROBERTS, CHRISTINE A |
00-19884 |
$345,000 |
Warranty Deed |
|
|
|
|
|
|
|
- If applicable, the described property is receiving special valuation based upon its use. Additional rollback taxes which may become due based on the provisions of the special valuation are not indicated in this listing.
| 2025 |
$17,635.63 |
$17,502.53 |
$133.10| SFP ODF WILDFIRE PROTECTION-TIMBER | $75.10 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $58.00 |
|
$17,635.63 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$5,878.54 |
- |
- |
- |
$0.00 |
11-14-2025 |
$0.00 |
| Installment 2 |
$5,878.54 |
- |
- |
- |
$0.00 |
11-14-2025 |
$0.00 |
| Installment 3 |
$5,878.55 |
- |
- |
- |
$0.00 |
11-14-2025 |
$0.00 |
| 2024 |
$17,109.19 |
$16,996.78 |
$112.41| SFP ODF WILDFIRE PROTECTION-TIMBER | $64.91 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$17,109.19 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$5,703.06 |
- |
- |
- |
$0.00 |
11-1-2024 |
$0.00 |
| Installment 2 |
$5,703.06 |
- |
- |
- |
$0.00 |
11-1-2024 |
$0.00 |
| Installment 3 |
$5,703.07 |
- |
- |
- |
$0.00 |
11-1-2024 |
$0.00 |
| 2023 |
$14,369.57 |
$14,252.52 |
$117.05| SFP ODF WILDFIRE PROTECTION-TIMBER | $69.55 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$14,369.57 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,789.85 |
- |
- |
- |
$0.00 |
11-20-2023 |
$0.00 |
| Installment 2 |
$4,789.85 |
- |
- |
- |
$0.00 |
11-20-2023 |
$0.00 |
| Installment 3 |
$4,789.87 |
- |
- |
- |
$0.00 |
11-20-2023 |
$0.00 |
| 2022 |
$14,051.53 |
$13,950.94 |
$100.59| SFP ODF WILDFIRE PROTECTION-TIMBER | $53.09 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$14,051.53 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,683.84 |
- |
- |
- |
$0.00 |
11-17-2022 |
$0.00 |
| Installment 2 |
$4,683.84 |
- |
- |
- |
$0.00 |
11-17-2022 |
$0.00 |
| Installment 3 |
$4,683.85 |
- |
- |
- |
$0.00 |
11-17-2022 |
$0.00 |
| 2021 |
$13,563.25 |
$13,467.19 |
$96.06| SFP ODF WILDFIRE PROTECTION-TIMBER | $48.56 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$13,563.25 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,521.09 |
- |
- |
- |
$0.00 |
11-15-2021 |
$0.00 |
| Installment 2 |
$4,521.08 |
- |
- |
- |
$0.00 |
11-15-2021 |
$0.00 |
| Installment 3 |
$4,521.08 |
- |
- |
- |
$0.00 |
11-15-2021 |
$0.00 |
| 2020 |
$14,155.66 |
$14,062.88 |
$92.78| SFP ODF WILDFIRE PROTECTION-TIMBER | $45.28 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$14,155.66 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,718.56 |
- |
- |
- |
$0.00 |
11-17-2020 |
$0.00 |
| Installment 2 |
$4,718.55 |
- |
- |
- |
$0.00 |
11-17-2020 |
$0.00 |
| Installment 3 |
$4,718.55 |
- |
- |
- |
$0.00 |
11-17-2020 |
$0.00 |
| 2019 |
$13,226.70 |
$13,139.15 |
$87.55| SFP ODF WILDFIRE PROTECTION-TIMBER | $40.05 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$13,226.70 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,408.90 |
- |
- |
- |
$0.00 |
11-19-2019 |
$0.00 |
| Installment 2 |
$4,408.90 |
- |
- |
- |
$0.00 |
11-19-2019 |
$0.00 |
| Installment 3 |
$4,408.90 |
- |
- |
- |
$0.00 |
11-19-2019 |
$0.00 |
| 2018 |
$13,888.64 |
$13,803.94 |
$84.70| SFP ODF WILDFIRE PROTECTION-TIMBER | $37.20 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$13,888.64 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,629.55 |
- |
- |
- |
$0.00 |
11-15-2018 |
$0.00 |
| Installment 2 |
$4,629.55 |
- |
- |
- |
$0.00 |
11-15-2018 |
$0.00 |
| Installment 3 |
$4,629.54 |
- |
- |
- |
$0.00 |
11-15-2018 |
$0.00 |
| 2017 |
$13,836.91 |
$13,750.21 |
$86.70| SFP ODF WILDFIRE PROTECTION-TIMBER | $39.20 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$13,836.91 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$4,612.31 |
- |
- |
- |
$0.00 |
11-28-2017 |
$0.00 |
| Installment 2 |
$4,612.30 |
- |
- |
- |
$0.00 |
11-28-2017 |
$0.00 |
| Installment 3 |
$4,612.30 |
- |
- |
- |
$0.00 |
11-28-2017 |
$0.00 |
| 2016 |
$11,577.06 |
$11,492.83 |
$84.23| SFP ODF WILDFIRE PROTECTION-TIMBER | $36.73 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$11,577.06 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,859.02 |
- |
- |
- |
$0.00 |
11-8-2016 |
$0.00 |
| Installment 2 |
$3,859.02 |
- |
- |
- |
$0.00 |
11-8-2016 |
$0.00 |
| Installment 3 |
$3,859.02 |
- |
- |
- |
$0.00 |
11-8-2016 |
$0.00 |
| 2015 |
$11,973.23 |
$11,890.82 |
$82.41| SFP ODF WILDFIRE PROTECTION-TIMBER | $34.91 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$11,973.23 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,991.08 |
- |
- |
- |
$0.00 |
11-6-2015 |
$0.00 |
| Installment 2 |
$3,991.08 |
- |
- |
- |
$0.00 |
11-6-2015 |
$0.00 |
| Installment 3 |
$3,991.07 |
- |
- |
- |
$0.00 |
11-6-2015 |
$0.00 |
| 2014 |
$11,657.54 |
$11,578.05 |
$79.49| SFP ODF WILDFIRE PROTECTION-TIMBER | $31.99 | | SFPI ODF WILDFIRE PROTECTION-STRUCTURE | $47.50 |
|
$11,657.54 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,885.85 |
- |
- |
- |
$0.00 |
11-19-2014 |
$0.00 |
| Installment 2 |
$3,885.85 |
- |
- |
- |
$0.00 |
11-19-2014 |
$0.00 |
| Installment 3 |
$3,885.84 |
- |
- |
- |
$0.00 |
11-19-2014 |
$0.00 |
| 2013 |
$11,134.78 |
$0.00 |
$0 |
$11,134.78 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,711.60 |
- |
- |
- |
$0.00 |
11-8-2013 |
$0.00 |
| Installment 2 |
$3,711.59 |
- |
- |
- |
$0.00 |
11-8-2013 |
$0.00 |
| Installment 3 |
$3,711.59 |
- |
- |
- |
$0.00 |
11-8-2013 |
$0.00 |
| 2012 |
$10,223.61 |
$0.00 |
$0 |
$10,223.61 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,407.87 |
- |
- |
- |
$0.00 |
10-23-2012 |
$0.00 |
| Installment 2 |
$3,407.87 |
- |
- |
- |
$0.00 |
10-23-2012 |
$0.00 |
| Installment 3 |
$3,407.87 |
- |
- |
- |
$0.00 |
10-23-2012 |
$0.00 |
| 2011 |
$11,126.91 |
$0.00 |
$0 |
$11,126.91 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,708.97 |
- |
- |
- |
$0.00 |
10-27-2011 |
$0.00 |
| Installment 2 |
$3,708.97 |
- |
- |
- |
$0.00 |
10-27-2011 |
$0.00 |
| Installment 3 |
$3,708.97 |
- |
- |
- |
$0.00 |
10-27-2011 |
$0.00 |
| 2010 |
$11,032.53 |
$0.00 |
$0 |
$11,032.53 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,677.51 |
- |
- |
- |
$0.00 |
10-29-2010 |
$0.00 |
| Installment 2 |
$3,677.51 |
- |
- |
- |
$0.00 |
10-29-2010 |
$0.00 |
| Installment 3 |
$3,677.51 |
- |
- |
- |
$0.00 |
10-29-2010 |
$0.00 |
| 2009 |
$10,708.39 |
$0.00 |
$0 |
$10,708.39 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,569.47 |
- |
- |
- |
$0.00 |
11-18-2009 |
$0.00 |
| Installment 2 |
$3,569.46 |
- |
- |
- |
$0.00 |
11-18-2009 |
$0.00 |
| Installment 3 |
$3,569.46 |
- |
- |
- |
$0.00 |
11-18-2009 |
$0.00 |
| 2008 |
$10,398.36 |
$0.00 |
$0 |
$10,398.36 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,466.12 |
- |
- |
- |
$0.00 |
11-18-2008 |
$0.00 |
| Installment 2 |
$3,466.12 |
- |
- |
- |
$0.00 |
11-18-2008 |
$0.00 |
| Installment 3 |
$3,466.12 |
- |
- |
- |
$0.00 |
11-18-2008 |
$0.00 |
| 2007 |
$10,115.35 |
$0.00 |
$0 |
$10,115.35 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,371.79 |
- |
- |
- |
$0.00 |
11-8-2007 |
$0.00 |
| Installment 2 |
$3,371.78 |
- |
- |
- |
$0.00 |
11-8-2007 |
$0.00 |
| Installment 3 |
$3,371.78 |
- |
- |
- |
$0.00 |
11-8-2007 |
$0.00 |
| 2006 |
$9,889.05 |
$0.00 |
$0 |
$9,889.05 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,296.35 |
- |
- |
- |
$0.00 |
11-1-2006 |
$0.00 |
| Installment 2 |
$3,296.35 |
- |
- |
- |
$0.00 |
11-1-2006 |
$0.00 |
| Installment 3 |
$3,296.35 |
- |
- |
- |
$0.00 |
11-1-2006 |
$0.00 |
| 2005 |
$9,672.20 |
$0.00 |
$0 |
$9,672.20 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$3,224.07 |
- |
- |
- |
$0.00 |
11-1-2005 |
$0.00 |
| Installment 2 |
$3,224.07 |
- |
- |
- |
$0.00 |
11-1-2005 |
$0.00 |
| Installment 3 |
$3,224.06 |
- |
- |
- |
$0.00 |
11-1-2005 |
$0.00 |
| 2004 |
$7,993.13 |
$0.00 |
$0 |
$7,993.13 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$2,664.38 |
- |
- |
- |
$0.00 |
11-17-2004 |
$0.00 |
| Installment 2 |
$2,664.38 |
- |
- |
- |
$0.00 |
11-17-2004 |
$0.00 |
| Installment 3 |
$2,664.37 |
- |
- |
- |
$0.00 |
11-17-2004 |
$0.00 |
| 2003 |
$2,015.51 |
$0.00 |
$0 |
$2,015.51 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$671.84 |
- |
- |
- |
$0.00 |
11-4-2003 |
$0.00 |
| Installment 2 |
$671.84 |
- |
- |
- |
$0.00 |
11-4-2003 |
$0.00 |
| Installment 3 |
$671.83 |
- |
- |
- |
$0.00 |
11-4-2003 |
$0.00 |
| 2002 |
$1,346.06 |
$0.00 |
$0 |
$1,346.06 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$448.69 |
- |
- |
- |
$0.00 |
11-4-2002 |
$0.00 |
| Installment 2 |
$448.69 |
- |
- |
- |
$0.00 |
11-4-2002 |
$0.00 |
| Installment 3 |
$448.68 |
- |
- |
- |
$0.00 |
11-4-2002 |
$0.00 |
| 2001 |
$2,006.12 |
$0.00 |
$0 |
$2,006.12 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$668.71 |
- |
- |
- |
$0.00 |
11-16-2001 |
$0.00 |
| Installment 2 |
$668.71 |
- |
- |
- |
$0.00 |
11-16-2001 |
$0.00 |
| Installment 3 |
$668.70 |
- |
- |
- |
$0.00 |
11-16-2001 |
$0.00 |
| 2000 |
$2,042.74 |
$0.00 |
$0 |
$2,042.74 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$680.92 |
- |
- |
- |
$0.00 |
11-15-2000 |
$0.00 |
| Installment 2 |
$680.91 |
- |
- |
- |
$0.00 |
11-15-2000 |
$0.00 |
| Installment 3 |
$680.91 |
- |
- |
- |
$0.00 |
11-15-2000 |
$0.00 |
| 1999 |
$1,905.70 |
$0.00 |
$0 |
$1,905.70 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$635.24 |
- |
- |
- |
$0.00 |
11-15-2000 |
$0.00 |
| Installment 2 |
$635.23 |
- |
- |
- |
$0.00 |
11-15-2000 |
$0.00 |
| Installment 3 |
$635.23 |
- |
- |
- |
$0.00 |
11-15-2000 |
$0.00 |
| 1998 |
$1,699.73 |
$0.00 |
$0 |
$1,699.73 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$566.58 |
- |
- |
- |
$0.00 |
3-19-1999 |
$0.00 |
| Installment 2 |
$566.58 |
- |
- |
- |
$0.00 |
3-19-1999 |
$0.00 |
| Installment 3 |
$566.57 |
- |
- |
- |
$0.00 |
3-25-1999 |
$0.00 |
| 1997 |
$1,654.23 |
$0.00 |
$0 |
$1,654.23 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$551.41 |
- |
- |
- |
$0.00 |
12-16-1997 |
$0.00 |
| Installment 2 |
$551.41 |
- |
- |
- |
$0.00 |
3-19-1999 |
$0.00 |
| Installment 3 |
$551.41 |
- |
- |
- |
$0.00 |
3-19-1999 |
$0.00 |
| 1996 |
$1,950.08 |
$0.00 |
$0 |
$1,950.08 |
$0.00 |
- |
$0.00 |
| Installment 1 |
$650.03 |
- |
- |
- |
$0.00 |
8-11-1997 |
$0.00 |
| Installment 2 |
$650.03 |
- |
- |
- |
$0.00 |
8-11-1997 |
$0.00 |
| Installment 3 |
$650.02 |
- |
- |
- |
$0.00 |
8-11-1997 |
$0.00 |
|
|
|
|
|
| 2025 |
JOCO-220327 |
11-14-2025 |
$17,106.56 |
| 2024 |
JOCO-162822 |
11-1-2024 |
$16,595.92 |
| 2023 |
JOCO-140328 |
11-20-2023 |
$13,938.49 |
| 2023 |
JOCO-140328 |
11-20-2023 |
($13,938.49) |
| 2023 |
JOCO-141285 |
11-20-2023 |
$13,938.49 |
| 2022 |
JOCO-86117 |
11-17-2022 |
$13,629.99 |
| 2021 |
JOCO-37056 |
11-15-2021 |
$13,156.36 |
| 2021 |
JOCO-37056 |
11-15-2021 |
($13,156.36) |
| 2021 |
JOCO-40336 |
11-15-2021 |
$13,156.36 |
| 2020 |
1238187 |
11-17-2020 |
$13,730.99 |
| 2019 |
1192308 |
11-19-2019 |
$12,829.90 |
| 2018 |
1137165 |
11-15-2018 |
$13,471.98 |
| 2017 |
1093068 |
11-28-2017 |
$13,421.80 |
| 2016 |
1026687 |
11-8-2016 |
$11,229.75 |
| 2015 |
979634 |
11-6-2015 |
$11,614.03 |
| 2014 |
948639 |
11-19-2014 |
$11,307.81 |
| 2013 |
884881 |
11-8-2013 |
$10,800.74 |
| 2012 |
824487 |
10-23-2012 |
$9,916.90 |
| 2011 |
770770 |
10-27-2011 |
$10,793.10 |
| 2010 |
718398 |
10-29-2010 |
$10,701.55 |
| 2009 |
695827 |
11-18-2009 |
$10,387.14 |
| 2008 |
639179 |
11-18-2008 |
$10,086.41 |
| 2007 |
569985 |
11-8-2007 |
$9,811.89 |
| 2006 |
512817 |
11-1-2006 |
$9,592.38 |
| 2005 |
462757 |
11-1-2005 |
$9,382.03 |
| 2004 |
435407 |
11-17-2004 |
$7,753.34 |
| 2003 |
361517 |
11-4-2003 |
$1,955.04 |
| 2002 |
313126 |
11-4-2002 |
$1,305.68 |
| 2001 |
275598 |
11-16-2001 |
$1,945.94 |
2000| This payment was made for multiple tax years: | |
|
220338 |
11-15-2000 |
$4,115.84 |
| 1998 |
138500 |
3-25-1999 |
$29.81 |
1998| This payment was made for multiple tax years: | |
|
138348 |
3-19-1999 |
$3,009.42 |
| 1997 |
69650 |
12-16-1997 |
$551.41 |
| 1996 |
46073 |
8-11-1997 |
$2,106.08 |
|
|